Common problems and solutions in the construction of aluminum alloy gutter glass greenhouse
The aluminum alloy gutter system also has high requirements on the actual construction quality on site. In addition to the construction of civil works and the main steel structure in strict accordance with the drawings and corresponding specifications, the installation quality of aluminum alloys and covering materials is also very important. This article will focus on aluminum The problems that are often encountered in the construction of the glass greenhouse of the alloy gutter system and the suggested solutions.
Unreasonable butt joint of roof ridge
In order to prevent such problems, a 2 mm thick EPDM material can be used to cushion the ridges between the ridges after the ridges are butted and before the two ridge connectors are installed. EPDM is a soft connection, and reaching a certain thickness can effectively alleviate this problem. Deformation gaps, or use neutral silicone structural adhesive to evenly inject glue at the butt joints of the ridges, to a certain extent alleviate the adverse effects of the larger deformation gaps.
Water leakage at the lap joint between the side wall gutter and the side wall facade
At the lap seal of the roof and the side wall, the EPDM strips with the profile code of 1750 are embedded in the grooves of the gutter and the façade roof profiles to seal. The requirement is that the rubber strips overlap along the slope and leave a lap length of about 100 mm (Figure 4~5). However, during the actual operation of the greenhouse, since the rubber strips are soft, when the amount of rain is large, the rubber strips will Concave, so the rainwater will accumulate in the groove, and then the water will leak into the room at the overlap of the rubber strip, causing water leakage at the overlap between the roof side wall gutter and the side wall façade. The length of the rubber strip with the code 1750 sealed here can be made the same length as the side wall. The length of the rubber strip is the same as the length of the roll production to the greenhouse, and the splicing of the rubber strip is cancelled. Effectively solve the above problems. If you encounter a project with a long greenhouse bay, you can use the glue strip ironing technology to iron the two parts of the glue strip. Although the construction increases the workload, it can effectively solve the problem of water leakage at the overlap.
Greenhouse lightning protection grounding rod installation design problems
The position of the greenhouse electric box conflicts with the position of the heating pipe
In the greenhouse design stage, the electrical engineer has already arranged the greenhouse electrical control box in the fixed position of the greenhouse floor plan, but in the actual construction, if the greenhouse is located in the north (such as Jilin and other provinces with very low temperature in winter), the greenhouse will When equipped with a heating system, due to its particularity, the heating pipelines need to be arranged on site according to the actual situation except for the specific locations specified in most drawings. If the location of the electrical control box needs to be arranged, it is necessary Adjust the position of the electrical box on site, so that the wiring arrangement of the external wires of the electrical control box will change, and the length of the external wires of the control box will be insufficient. Redesign, procurement, and delivery will affect the construction period and cost. It is recommended to reserve a 1.5 m position beside the door of each area to place the electrical control box specially, so that no matter if you encounter a greenhouse with or without heating pipes, there will be no problem of position conflict.
When carrying out the construction of aluminum alloy gutter glass greenhouse, first of all, the construction should be carried out in strict accordance with the design drawings. When encountering unreasonable places, the plan cannot be changed without authorization, and the relevant personnel should be effectively communicated and solved. Reasonable construction technology can maximize the design results, and the problems found in the construction and the suggestions given can also better assist the design, processing and production, and provide users with more practical greenhouse products.